OK, time to try another solution. I bought some chain and two new sprockets for the existing electric motor. I mounted the motor under the skeleton of the beetle. Actually, I like the positioning of this setup better. The chain will have eight cups attached to it. These will carry the marbles to the top of the sculpture.